Aware at the potential of the harvesting the wind energy, Malaysian Government under Joint venture partnership with the State Government of Terengganu and National Electric Board in 2007 embark on the project of integrating power supply at Pulau Perhentian (Perhentian Island). The project consists of installing two wind turbine, solar farm (Solar Panel), Generator and battery. This paper will encompass on the hybrid system implemented at the Perhentian Island, Malaysia.

Categories: Air, Angin, Marin
Tags: Artikel Jurnal, Data Penerbitan, Sulit